GS3 · UPSC Mains
Why retrofitting Electrostatic Precipitators (ESPs) in Indian thermal power plants is a more viable and effective option compared to the installation of flue gas desulfurization (FGD) systems?
| Topper | Rank | Source | Copy |
|---|---|---|---|
| Dishant A Nisar | AIR 19 · 2025 | Forumias | p.13 |
| Kanishak Aggarwal | AIR 72 · 2025 | Forumias | p.9 |
| Polavarapu Dhwanish | AIR 108 · 2025 | Forumias | p.13 |
| Rishabh Sharma | AIR 116 · 2025 | Forumias | p.13 |
| Aditya Pathak | AIR 189 · 2025 | Forumias | p.13 |
| Dsk Prachet | AIR 193 · 2025 | Forumias | p.12 |
| Sakshee Mishra | AIR 214 · 2025 | Forumias | p.13 |
| Ayush Pathak | AIR 215 · 2025 | Forumias | p.13 |
| Liza Garga | AIR 303 · 2025 | Forumias | p.13 |
| Gaurav Kumar (AIR 377) | — | Forumias | p.12 |
| Suramya Sharma | — | Forumias | p.13 |
| Shreya | — | Forumias | p.13 |